Sprint planning - S90

@Link to the recording:

https://ubc.zoom.us/rec/share/j-dpOxt15_yIOzOXR733DBxspTeLjK_p27pC6IdQHJt0p64gVPmGatrYgfyh-BDS.QEJUsmjMsKrl2mtw

Passcode: rc?0V0#^

Themes and priorities for this sprint: 

  1. PREPARING FOR THIS RELEASE: Unreleased (Soil amendment)

    1. https://lite-farm.atlassian.net/browse/LF-4213

    2. https://lite-farm.atlassian.net/browse/LF-4029

    3. https://lite-farm.atlassian.net/browse/LF-4231

    4. Bug bash on soil amendment + product-related task flows: https://lite-farm.atlassian.net/wiki/spaces/LITEFARM/pages/1423081473

    5. Non-development work:

      1. Release notes for 3.6.5 @Loic Sans and translations

      2. Translation work for 3.6.5 MISSING strings @Loic Sans @Larisse Cavalcante @David Trapp


  1. Continuing with: Unreleased (Animals)

    1. https://lite-farm.atlassian.net/browse/LF-4144

      1. https://lite-farm.atlassian.net/browse/LF-4172 preferably, but not at the expense of 3.6.5, before Loïc goes on summer vacation

    2. https://lite-farm.atlassian.net/browse/LF-4150

    3. Animals release scope bugs:

      1. https://lite-farm.atlassian.net/browse/LF-4226

      2. https://lite-farm.atlassian.net/browse/LF-4238

      3. https://lite-farm.atlassian.net/browse/LF-3884

      4. https://lite-farm.atlassian.net/browse/LF-3606

    4. Other Bugs Available:

      1. User can edit an already deleted expense or revenue.

      2. An assignee of the task is not notified that the task has been abandoned as a part of the Crop plan.

      3. Delete task clickable area is too large.

      4. Can't open the water calculator for a wild crop when the method of measurement is Depth

Reading for this sprint

Intro reads:

Animals specific reads:

Other readings haven’t been significantly updated since S79. However, they’re listed below from most high level to most detailed:

Forward-looking reads:

What’s the definition of done for a story? 

  • Code

  • Language tags - (run pnpm i18n script in /webapp )

    • If En copy changes on a ticket please set all the non-En tags to “MISSING”

    • Es version of the language tag as “MISSING”

    • Pt version of the language tag as “MISSING”

    • Fr version of the language tag as “MISSING”

  • Unit testing

  • Check in with @Loic Sans if there’s a visual component to the story

  • Open up a PR, and leave it unassigned. Two reviewers from the core team will be automatically added. Core team to incorporate feedback given during peer review.

  • Passes peer review x 1

    • Reviewer will be auto-added

  • Merged

  • Passes verification

  • User stories with UX/UI component: Passes validation with @Loic Sans

 

Team availability

S90 runs from … to …

Thursday, June 20th

Wednesday, July 3rd

Days in sprint: 9 (Monday July 1st = Canada Day)

Person

Days in sprint

Notes

@David Trapp

2?

I’ll be visiting partners in Colombia from 6/24 - 7/04, responding in the evenings

@Sayaka Ono

9

OOO Friday June 21 morning for farm visit

@Joyce Sato-Reinhold

9

OOO Friday June 21 morning for farm visit

@Duncan Brain

9

 

@Denis Dovganyuk

9

 

@Loic Sans

5

Out June 21st + On Holiday starting Jul 1 (3-4 weeks)

@Larisse Cavalcante

9

 

@Lite Farm

Async

Wrapping up

@Serhii Zahranychnyi

Async

 

@Navdeep Dhammu

Async

 

@Gursimran Singh

Async

 

@shashank hegde

Async

 

@Joaquín Moreno

Async