Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

@Link to the recording:

Themes and priorities for this sprint: 

  1. Language Release(s) https://lite-farm.atlassian.net/projects/LF/versions/10026/tab/release-report-all-issues on Tuesday September 17th + Thursday September 26th https://lite-farm.atlassian.net/projects/LF/versions/10027/tab/release-report-all-issues

    1. Tuesday release = Only for German?

      1. Presentation for German on the 18th

      2. Do we want to silent release this and only publish a Wix post when all four translations are in?What is the status of the Wix post + its translations?

        1. Product team has decided on a LinkedIn post instead of a feature release with blog story

        2. There will be a feature section release on the Wix page announcing that LiteFarm is now available in 8 languages

    2. Malayalam release required one week later approximately (September 26th)

      1. exact date: Sept 27th presentation

      2. Translation reviews will be happening by the end of today (in Hindi)

      3. This is the document (WD) the reviewers will be using as a guide: https://docs.google.com/document/d/1wQkXlLPSGmDKLSGRk7AKJs3LBsGNiX-zvHlB_VtB0ys/edit?usp=sharing

    3. Please see as well https://lite-farm.atlassian.net/wiki/x/dQHBYg

      1. Update on bug status

      2. Denis Dovganyuk has added all the bugs reviewed on Monday to Jira

...

  1. Animals Release https://lite-farm.atlassian.net/projects/LF/versions/10019/tab/release-report-all-issues

    1. Edit and readonly views

      Jira Legacy
      serverSystem Jira
      serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
      keyLF-4373

    2. Beta status and badget badge

      Jira Legacy
      serverSystem Jira
      serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
      keyLF-4369

    3. Small adjusts across animals (open PRs)

      1. https://github.com/LiteFarmOrg/LiteFarm/pull/3399

      2. https://github.com/LiteFarmOrg/LiteFarm/pull/3400

    4. Bugs identified in Add Animals Flow (roughly in order of priority)

      1. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-4410

      2. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-4409

      3. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-4413

      4. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-4411

      5. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-4412

      6. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-4414

      7. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-4415

      8. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-4417

      9. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-4418

...

  • Code

  • Language tags - (run pnpm i18n script in /webapp )

    • If En copy changes on a ticket please set all the non-En tags to “MISSING”

    • Es version of the language tag as “MISSING”

    • Pt version of the language tag as “MISSING”

    • Fr version of the language tag as “MISSING”

    • (Note: Our transition to CrowdIn has not changed this requirement)

  • Unit testing

  • Check in with Loic Sans if there’s a visual component to the story

  • Open up a PR, and leave it unassigned. Two reviewers from the core team will be automatically added. Core team to incorporate feedback given during peer review.

  • Passes peer review x 2

    • Reviewer will be auto-added

  • Merged

  • Passes verification

  • User stories with UX/UI component: Passes validation with Loic Sans

Team availability

S94 S96 runs from … to …

Thursday, Aug 29Sep 12

Wednesday, Sept 1125

Days in sprint: 10

Person

Days in sprint

Notes

David Trapp

9

OOO Sep 13

Sayaka Ono

0

OOO Sep 3 - 27

Joyce Sato-Reinhold

10

Duncan Brain

10

Denis Dovganyuk

10

Loic Sans

8

OOO Sept 9 -14

Larisse Cavalcante

7

OOO 23-27

Divya Chayanam

10

Anto Sgarlatta

10

Kevin Wu

Async

Shang Heng Mak

Async

Daria

Async

Based in CET – avail morning-ish