Sprint planning - S96
@Link to the recording:
Themes and priorities for this sprint:
Language Release(s) https://lite-farm.atlassian.net/projects/LF/versions/10026/tab/release-report-all-issues on Tuesday September 17th + Thursday September 26th https://lite-farm.atlassian.net/projects/LF/versions/10027/tab/release-report-all-issues
Tuesday release = Only for German?
Presentation for German on the 18th
Do we want to silent release this and only publish a Wix post when all four translations are in?
Product team has decided on a LinkedIn post instead of a feature release with blog story
There will be a feature section release on the Wix page announcing that LiteFarm is now available in 8 languages
Malayalam release required one week later approximately (September 26th)
exact date: Sept 27th presentation
Translation reviews will be happening by the end of today (in Hindi)
This is the document (WD) the reviewers will be using as a guide: https://docs.google.com/document/d/1wQkXlLPSGmDKLSGRk7AKJs3LBsGNiX-zvHlB_VtB0ys/edit?usp=sharing
Please see as well https://lite-farm.atlassian.net/wiki/x/dQHBYg
Update on bug status
@Denis Dovganyuk has added all the bugs reviewed on Monday to Jira
Animals Release https://lite-farm.atlassian.net/projects/LF/versions/10019/tab/release-report-all-issues
Edit and readonly views https://lite-farm.atlassian.net/browse/LF-4373
Beta status and badge https://lite-farm.atlassian.net/browse/LF-4369
Small adjusts across animals (open PRs)
Bugs identified in Add Animals Flow (roughly in order of priority)
Misc/developer experience: https://lite-farm.atlassian.net/browse/LF-4364
Other bugs (please prioritize the ones above first)
Reading for this sprint
Intro reads:
Getting started! [10 minutes]
Tips and tricks [5 minutes]
Intro to the LiteFarm app [20 minutes /w videos]
A brief tour of the codebase and tech stack [5 minutes]
Source control and the developer’s workflow [5 minutes]
Animals specific reads:
Other readings haven’t been significantly updated since S79. However, they’re listed below from most high level to most detailed:
https://lite-farm.atlassian.net/wiki/spaces/LITEFARM/pages/822018049 [10 minutes]
https://lite-farm.atlassian.net/wiki/spaces/LITEFARM/pages/1368227863 [10 minutes]
https://lite-farm.atlassian.net/wiki/spaces/LITEFARM/pages/1378910214 [15 minutes]
https://lite-farm.atlassian.net/wiki/spaces/LITEFARM/pages/1309999105 [10 minutes]
https://lite-farm.atlassian.net/wiki/spaces/LITEFARM/pages/1404567587 [reference]
https://lite-farm.atlassian.net/wiki/spaces/LITEFARM/pages/1394835499 [5 minutes, reference]
https://lite-farm.atlassian.net/wiki/spaces/LITEFARM/pages/1428750337 [completed]
Forward-looking reads:
What’s the definition of done for a story?
Code
Language tags - (run
pnpm i18n
script in/webapp
)If En copy changes on a ticket please set all the non-En tags to “MISSING”
Es version of the language tag as “MISSING”
Pt version of the language tag as “MISSING”
Fr version of the language tag as “MISSING”
(Note: Our transition to CrowdIn has not changed this requirement)
Unit testing
Check in with @Loic Sans if there’s a visual component to the story
Open up a PR, and leave it unassigned. Two reviewers from the core team will be automatically added. Core team to incorporate feedback given during peer review.
Passes peer review x 2
Reviewer will be auto-added
Merged
Passes verification
User stories with UX/UI component: Passes validation with @Loic Sans
Team availability
S96 runs from … to …
Thursday, Sep 12 | Wednesday, Sept 25 |
Days in sprint: 10
Person | Days in sprint | Notes |
@David Trapp | 9 | OOO Sep 13 |
@Sayaka Ono | 0 | OOO Sep 3 - 27 |
@Joyce Sato-Reinhold | 10 |
|
@Duncan Brain | 10 |
|
@Denis Dovganyuk | 10 |
|
@Loic Sans | 8 | OOO Sept 9 -14 |
@Larisse Cavalcante | 7 | OOO 23-27 |
@Divya Chayanam | 10 |
|
@Anto Sgarlatta | 10 |
|
@Kevin Wu | Async |
|
@Shang Heng Mak | Async |
|
Daria | Async | Based in CET – avail morning-ish |
|
|
|