Themes and priorities for this sprint:
Complete animal removal flow - LF-4116Getting issue details... STATUS - LF-4117Getting issue details... STATUS
Final integration work
Addition of removal date field
Dashboard filters
- LF-3060Getting issue details... STATUS
Introduction of time as well
Animal creation flow (Lite Farm)
Tech debt tickets
Pre-reading for this sprint
Intro reads:
Getting started! [10 minutes]
Tips and tricks [5 minutes]
Intro to the LiteFarm app [20 minutes /w videos]
A brief tour of the codebase and tech stack [5 minutes]
Source control and the developer’s workflow [5 minutes]
Animals specific reads:
We should be wrapping up Detailed livestock records V1 and /wiki/spaces/LITEFARM/pages/1428750337, so those are a good place to start.
Other readings haven’t been significantly updated since S79. However, they’re listed below from most high level to most detailed:
Livestock [10 minutes]
/wiki/spaces/LITEFARM/pages/1368227863 [10 minutes]
Detailed livestock records V1 [15 minutes]
/wiki/spaces/LITEFARM/pages/1309999105 [10 minutes]
/wiki/spaces/LITEFARM/pages/1404567587 [reference]
/wiki/spaces/LITEFARM/pages/1394835499 [5 minutes, reference]
What’s the definition of done for a story?
Code
Language tags - (run
pnpm i18n
script in/webapp
)If En copy changes on a ticket please set all the non-En tags to “MISSING”
Es version of the language tag as “MISSING”
Pt version of the language tag as “MISSING”
Fr version of the language tag as “MISSING”
Unit testing
Check in with Loic Sans if there’s a visual component to the story
Open up a PR, and leave it unassigned. Two reviewers from the core team will be automatically added. Core team to incorporate feedback given during peer review. (Check if this is working well for PRs from forks from contributors).
Passes peer review x 2
Anto will review all PRs
Second reviewer will be auto-added
Merged
Passes verification
Passes validation
Team availability
S82 runs from … to …
Thursday, March 14th | Wednesday, March 27th |
Days in sprint: 9
Person | Days in sprint | Notes | |
9 | |||
2.5 | Mostly OOO until March 25th | ||
9 | |||
9 | |||
9 | |||
9 | |||
8.5 | OOO after 12PM PT on March 14th (School in-service) | ||
8 | OOO Friday, March 22nd | ||
9 | |||
4 | March 19th, 20th, 26th, 27th |