Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Recording link:

https://ubc.zoom.us/rec/share/HCcSpWuBtskLc5VPyf9XCyNjDoricsWhF0zI_jjLkGG2dizeQ4b4bGbgRWrYhI0.btL10NrWexWE2VqD
Passcode: ?@HMnz9Z

Agenda

  • Soil V2

    • Soil sampling task

      • needed to fill gap between soil amendment task

    • Product table

      • setting aside for now

Discussion points

  • Soil sample location points

    • Details

      • name (auto name eg sample #8)

        • editable?:

          • not yet, only available on task

          • not useful since soil samples are mixed together

      • location (Lat Lng)

        • editability

          • remove

          • is edit possible?

        • number

          • (count) soft-linked to next part of screen

          • what happens if you remove count when you go back to the pin screen?

          • maybe a warning?

          • why not hard link?

            • very similar to how when you create an area on map but user can edit the total area afterwards

          • swap the form screens? Why location needs to be first?

            • will explore but:

            • doesn't match litefarm task pattern

          • where can a point be added?

            • in one location to be linked to the field

            • on multiple locations

            • select multiple areas

            • outside of areas

            • is soil analysis accurate for area if selected outside area?

            • Got to let the farmer use some common sense if linking to an area they shouldn't locate outside it unless they know what they are doing - restricting it would be condescending

          • allow user to input coordinates?

            • no: coordinates are approximate

            • other apps do it better

            • it would be a lot of work to do it better

  • Multiple depths per soil analysis?

    • No: its an important fact they should all be at the same depth

  • Complete flow

    • Should you be able to create a follow up analysis task?

      • should we force create it – it seems valuable?

        • maybe not: For example a test - you might practice a test and not complete it

    • The person who creates the sample task would be better to understand when the results might come back?

      • not the worker in complete flow?

TO DO

Task

Owner

Due date

Notes

  • No labels