Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

@Link to the recording:

Themes and priorities for this sprint: 

Completed last sprint: 🎉 RELEASING!!: https://lite-farm.atlassian.net/projects/LF/versions/10018/tab/release-report-all-issues (Soil amendment)


  1. Very small scope release to patch SurveyStack API endpoint: https://lite-farm.atlassian.net/projects/LF/versions/10024/tab/release-report-all-issues


  1. Continuing with: https://lite-farm.atlassian.net/projects/LF/versions/10019/tab/release-report-all-issues (Animals)

  2. LF-4150 - Getting issue details... STATUS

  3. LF-4204 - Getting issue details... STATUS

  4. Bugs Available:

    1. LF-3416 - Getting issue details... STATUS

    2. LF-3898 - Getting issue details... STATUS

    3. LF-4244 - Getting issue details... STATUS

    4. LF-4064 - Getting issue details... STATUS

Reading for this sprint

Intro reads:

Animals specific reads:

Other readings haven’t been significantly updated since S79. However, they’re listed below from most high level to most detailed:

Forward-looking reads:

What’s the definition of done for a story? 

  • Code

  • Language tags - (run pnpm i18n script in /webapp )

    • If En copy changes on a ticket please set all the non-En tags to “MISSING”

    • Es version of the language tag as “MISSING”

    • Pt version of the language tag as “MISSING”

    • Fr version of the language tag as “MISSING”

  • Unit testing

  • Check in with Loic Sans if there’s a visual component to the story

  • Open up a PR, and leave it unassigned. Two reviewers from the core team will be automatically added. Core team to incorporate feedback given during peer review.

  • Passes peer review x 1

    • Reviewer will be auto-added

  • Merged

  • Passes verification

  • User stories with UX/UI component: Passes validation with Loic Sans

Team availability

S91 runs from … to …

Thursday, Aug 1

Wednesday, Aug 15

BC Stat Holiday: Monday Aug 5, 2024

Days in sprint: 9

Person

Days in sprint

Notes

David Trapp

0

OOO July 29 - Sept 3, Visiting partners LWO August.

Sayaka Ono

9

Joyce Sato-Reinhold

Duncan Brain

Denis Dovganyuk

Loic Sans

Larisse Cavalcante

Divya Chayanam

Gursimran Singh

Async

  • No labels