Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

@Link to the recording:

https://ubc.zoom.us/rec/share/CD3j-dpOxt15_PxT4yQTy1v5x6qnjFmBzyIOzOXR733DBxspTeLjK_zCeUFvUTkGWjYQPJE2gibZpEBi56NkSqoFvsOwfp27pC6IdQHJt0p64gVPmGatrYgfyh-BDS.IE9LI2NxOVBfofv8QEJUsmjMsKrl2mtw

Passcode: .^nhu8t#rc?0V0#^

Themes and priorities for this sprint: 

  1. Data policy caching and release:PREPARING FOR THIS RELEASE: https://lite-farm.atlassian.net/projects/LF/versions/10018/tab/release-report-all-issues (Soil amendment)

    1. Jira Legacy
      serverSystem Jira
      serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
      keyLF-4240

    2. /wiki/spaces/LITEFARM/pages/1554317313

    Wrapping up the user story (maybe < 24 pts left?):
    1. 4213

    2. Jira Legacy
      serverSystem Jira
      serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
      keyLF-42134029

    3. Jira Legacy
      serverSystem Jira
      serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
      keyLF

    -4237Animals release scope bugs:
    1. -4231

    2. Bug bash on soil amendment + product-related task flows: /wiki/spaces/LITEFARM/pages/1423081473

    3. Non-development work:

      1. Release notes for 3.6.5 Loic Sans and translations

      2. Translation work for 3.6.5 MISSING strings Loic Sans Larisse Cavalcante David Trapp

...

  1. Continuing with: https://lite-farm.atlassian.net/projects/LF/versions/10019/tab/release-report-all-issues (Animals)

    1. Jira Legacy
      serverSystem Jira
      serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
      keyLF-

...

    1. 4144

      1. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-

...

      1. 4172
        preferably, but not at the expense of 3.6.5, before Loïc goes on summer vacation

    1. Jira Legacy
      serverSystem Jira
      serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
      keyLF-

...

    1. 4150

    2. Animals release scope bugs:

      1. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-

...

      1. 4226

      2. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-

...

      1. 4238

      2. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-

...

      1. 3884

      2. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-

...

      1. 3606

    1. Other Bugs Available:

      1. User can edit an already deleted expense or revenue.

      2. An assignee of the task is not notified that the task has been abandoned as a part of the Crop plan.

      3. Delete task clickable area is too large.

      4. Can't open the water calculator for a wild crop when the method of measurement is Depth

Reading for this sprint

Intro reads:

...

  • Code

  • Language tags - (run pnpm i18n script in /webapp )

    • If En copy changes on a ticket please set all the non-En tags to “MISSING”

    • Es version of the language tag as “MISSING”

    • Pt version of the language tag as “MISSING”

    • Fr version of the language tag as “MISSING”

  • Unit testing

  • Check in with Loic Sans if there’s a visual component to the story

  • Open up a PR, and leave it unassigned. Two reviewers from the core team will be automatically added. Core team to incorporate feedback given during peer review.

  • Passes peer review x 1

    • Reviewer will be auto-added

  • Merged

  • Passes verification

  • User stories with UX/UI component: Passes validation with Loic Sans

Team availability

S89 S90 runs from … to …

Thursday, June 6th20th

Wednesday, June 19thJuly 3rd

Days in sprint: 109 (Monday July 1st = Canada Day)

Person

Days in sprint

Notes

David Trapp

0

Checking email but out for masters until Monday June 17th David Trapp 2?

I’ll be visiting partners in Colombia from 6/24 - 7/04, responding in the evenings

Sayaka Ono

109

OOO Friday June 21 morning for farm visit

Joyce Sato-Reinhold10

9

OOO Friday June 21 morning for farm visit

Duncan Brain

9.5Out half day (afternoon) Fri Jun 7

Denis Dovganyuk

109

Loic Sans10

5

Out June 21st + On Holiday starting Jul 1 (3-4 weeks)

Larisse Cavalcante

7

Sick on June 6th and 7th. Out June 13th for travel.

9

Lite Farm

Avail Async

~ 2 hours / dayWrapping up

Serhii Zahranychnyi

10

~ 2 hours / day

Joaquín Moreno

10

~ 2 hours / day

Shashank

IST - avail async / evening?

Async

Navdeep Dhammu

Async

Gursimran Singh

Async

shashank hegde

Async

Joaquín Moreno

Async