Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Start recording on Zoom!

Themes and priorities for this sprint: 

  1. Complete work on the Animals Dashboard (https://www.figma.com/file/eMffC0h3JPlWtzNttxJpil/Litefarm-Updated?type=design&node-id=2780%3A48212&mode=design&t=mckGufx4VmYiUCAx-1), scope includes:

    1. Mocking of interactions and links to other pages

    2. No actual navigation / actions

    3. Desktop and mobile views

    4. Search

    5. Interactive KPIs

    6. Filters

    7. Animal selection and bulk action

  2. /wiki/spaces/LITEFARM/pages/1428750337

  3. Tech debt tickets

    1. LF-4022 - Getting issue details... STATUS

    2. LF-3893 - Getting issue details... STATUS

    3. LF-4021 - Getting issue details... STATUS

Pre-reading for this sprint 

Intro reads:

Animals specific reads:

We should be wrapping up the dashboard view for Detailed livestock records V1 this sprint, so this is a good place to start. We’re also beginning /wiki/spaces/LITEFARM/pages/1428750337 which has been updated for S81.

Other readings haven’t been significantly updated since S79. However, they’re listed below from most high level to most detailed:

What’s the definition of done for a story? 

  • Code

  • Language tags - (run pnpm i18n script in /webapp )

    • If En copy changes on a ticket please set all the non-En tags to “MISSING”

    • Es version of the language tag as “MISSING”

    • Pt version of the language tag as “MISSING”

    • Fr version of the language tag as “MISSING”

  • Unit testing

  • Check in with Loic Sans if there’s a visual component to the story

  • Open up a PR, and leave it unassigned. Two reviewers from the core team will be automatically added. Core team to incorporate feedback given during peer review. (Check if this is working well for PRs from forks from contributors).

  • Passes peer review x 2

    • Anto will review all PRs

    • Second reviewer will be auto-added

  • Merged

  • Passes verification

  • Passes validation

    • Loïc and Anto to fill in for David/Kevin on validation

Team availability

S81 runs from … to …

Thursday, February 15th

Wednesday, February 28th

Days in sprint: 8

Monday, February 19th is a holiday (Family Day)

Person

Days in sprint

Notes

Duncan Brain

David Trapp

Sayaka Ono

Joyce Sato-Reinhold

Denis Dovganyuk

Anto Sgarlatta

Lite Farm

Full time: 4-ish

Asynch: 4-ish

Available: Tue, Feb 20 - Fri Feb 23

Roadshow: Mon, Feb 26 - Mar 1

(Available asynch / evenings PT time)

Loic Sans

Larisse Cavalcante

Navdeep Dhammu

Calum Murray

1 - 2 points

  • No labels