Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Current »

@Link to the recording:

Passcode:

Themes and priorities for this sprint: 

  1. Prepare for languages release LF-4398 - Getting issue details... STATUS

  2. Wrap up Add animals - LF-4150 - Getting issue details... STATUS

  3. Continue work on Edit / Readonly Animals- LF-4373 - Getting issue details... STATUS

  4. Get ahead on Beta status - LF-4369 - Getting issue details... STATUS

  5. Other - LF-4364 - Getting issue details... STATUS

  6. Bugs Available (to be added if taken by someone):

    1. LF-4244 - Getting issue details... STATUS

    2. LF-4064 - Getting issue details... STATUS

    3. LF-3787 - Getting issue details... STATUS

    4. “Highest” priority bugs

      1. LF-4361 - Getting issue details... STATUS

      2. LF-4271 - Getting issue details... STATUS

      3. LF-4194 - Getting issue details... STATUS

      4. LF-3961 - Getting issue details... STATUS

Reading for this sprint

Intro reads:

Animals specific reads:

Other readings haven’t been significantly updated since S79. However, they’re listed below from most high level to most detailed:

Forward-looking reads:

What’s the definition of done for a story? 

  • Code

  • Language tags - (run pnpm i18n script in /webapp )

    • If En copy changes on a ticket please set all the non-En tags to “MISSING”

    • Es version of the language tag as “MISSING”

    • Pt version of the language tag as “MISSING”

    • Fr version of the language tag as “MISSING”

    • (Note: Our transition to CrowdIn has not changed this requirement)

  • Unit testing

  • Check in with Loic Sans if there’s a visual component to the story

  • Open up a PR, and leave it unassigned. Two reviewers from the core team will be automatically added. Core team to incorporate feedback given during peer review.

  • Passes peer review x 2

    • Reviewer will be auto-added

  • Merged

  • Passes verification

  • User stories with UX/UI component: Passes validation with Loic Sans

Team availability

S94 runs from … to …

Thursday, Aug 29

Wednesday, Sept 11

Days in sprint: 9 ( Labour Day: Monday Sept 2 )

  • No labels