Sprint planning - S116
@Link to the recording:
Passcode: tX7!e6RZ
Themes and priorities for this sprint:
Synching up Smart Irrigation (Irrigation Prescriptions) with Ensemble
Soil sampling researchers flow
Preparing for release 3.8.0
Highest Core Team Priorities
Onto preparing for the next release! 3.8.0 and the wrap-up of smart irrigation:
Should be able to check farm setups with Lewis / Farming Smarter on MONDAY
Ensemble to also be meeting with Lewis this week about pivot properties
ESci still to add VRIs… should we schedule a bug bash for the end of this sprint, or is that too optimistic?
Follow-ups from last sprint:
Release notes?
One big set of release notes for 3.7.7 & 3.8.0 (was tagged for Loïc and @Denis Dovganyuk last Sprint) @Divya Chayanam to follow-up and possibly wrap up
Translations – Hindi & German coming in?
German will be re-contacted; @Divya Chayanam; Divya also to do Hindi
Consent
@Joyce Sato-Reinhold and @Divya Chayanam to connect about this
Update: will not be necessary for this release
Irrigation Prescriptions https://lite-farm.atlassian.net/browse/LF-4759
S115 included meeting with Ensemble and updates for these actual Ensemble endpoints:
https://lite-farm.atlassian.net/browse/LF-4766
Should be testable on beta cronjob today, but structure of this will change further to handle the two locations / two crops on one pivot situation
https://lite-farm.atlassian.net/browse/LF-4767
Mostly complete, just needs date handling fixed up (in communication with Ensemble about this), and the locations change that will come in next week
https://lite-farm.atlassian.net/browse/LF-4788
Needs quite a few properties hashed out with Ensemble; in communication
Soil sample researcher’s flow – NOT required for Release 3.8.0 (according to last Sprint Planning’s discussion), but we could look at it while we wait for Ensemble + Smart Irrigation
https://lite-farm.atlassian.net/browse/LF-4827
@Divya Chayanam to get in touch with Jessica
@Joyce Sato-Reinhold to contact Riddhi / data team about database format of results → DONE. Will put notes in the Jira tickets
Take a look and discuss this as a backup task:
Highest Contributor Priorities
*Please tag dev or design on ticket if requirements are not clear or defined
IN PROGRESS (TECH DEBT)
AVAILABLE BUGS
High Priority
Medium priority
(Sizeable task, relating to persisted form data across app) https://lite-farm.atlassian.net/browse/LF-4614
Lower priority
Reading for this sprint
Intro reads:
Getting started! [10 minutes]
Intro to the LiteFarm app [20 minutes /w videos]
A brief tour of the codebase and tech stack [5 minutes]
Source control and the developer’s workflow [5 minutes]
Smart Irrigation specific reads:
Other readings haven’t been significantly updated since S79. However, they’re listed below from most high level to most detailed:
https://lite-farm.atlassian.net/wiki/spaces/LITEFARM/pages/1483472927 -[2min]
https://lite-farm.atlassian.net/wiki/spaces/LITEFARM/pages/1694629889 - [9min]
https://lite-farm.atlassian.net/wiki/spaces/LITEFARM/pages/1185611781 - [7min]
https://lite-farm.atlassian.net/wiki/spaces/LITEFARM/pages/1202290689 -[6min]
https://lite-farm.atlassian.net/wiki/spaces/LITEFARM/pages/1732935690 - [6min]
Forward-looking reads:
What’s the definition of done for a story?
Code
Note update language requirements:
Add string to
enMark your PR with the “new translations” tag
The CrowdIn GitHub automations will do the rest
Unit testing
Open up a PR, and leave it unassigned. Two reviewers from the core team will be automatically added. Core team to incorporate feedback given during peer review.
Passes peer review x 2
Reviewer will be auto-added
Merged
Passes verification
Team availability
S114 runs from … to …
Thursday, July 3rd | Wednesday, July 16th |
Days in sprint: 10
Person | Days in sprint | Notes |
@Sayaka Ono | 10 |
|
@Joyce Sato-Reinhold | 10 |
|
@Denis Dovganyuk | 10 |
|
@Divya Chayanam | 10 |
|
|
|
|
Contributors |
|
|
|
|
|