Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

@Link to the recording:

Themes and priorities for this sprint: 

Highest Core Team Priority – Animals Release https://lite-farm.atlassian.net/projects/LF/versions/10019/tab/release-report-all-issues

  1. Wrap up Edit and readonly views LF-4373 - Getting issue details... STATUS


Highest Contributor Priorities

  1. Beta status and badge LF-4369 - Getting issue details... STATUS

  2. Bugs identified in Add Animals Flow (roughly in order of priority)

    1. LF-4410 - Getting issue details... STATUS

    2. LF-4409 - Getting issue details... STATUS

    3. LF-4411 - Getting issue details... STATUS

    4. LF-4412 - Getting issue details... STATUS

    5. LF-4415 - Getting issue details... STATUS

    6. LF-4417 - Getting issue details... STATUS

    7. LF-4418 - Getting issue details... STATUS

Secondary Core Team Priorities

  1. Malayalam + Hindi + Punjabi language PROD release - Date TBD - https://lite-farm.atlassian.net/projects/LF/versions/10027/tab/release-report-all-issues

  2. Main technical ticket – discussion and/or review and merge

    1. Typescript on backend: https://github.com/LiteFarmOrg/LiteFarm/pull/3428

Reading for this sprint

Intro reads:

Animals specific reads:

Other readings haven’t been significantly updated since S79. However, they’re listed below from most high level to most detailed:

Forward-looking reads:

What’s the definition of done for a story? 

  • Code

  • Language tags - (run pnpm i18n script in /webapp )

    • If En copy changes on a ticket please set all the non-En tags to “MISSING”

    • Es version of the language tag as “MISSING”

    • Pt version of the language tag as “MISSING”

    • Fr version of the language tag as “MISSING”

    • (Note: Our transition to CrowdIn has not changed this requirement)

  • Unit testing

  • Check in with Loic Sans if there’s a visual component to the story

  • Open up a PR, and leave it unassigned. Two reviewers from the core team will be automatically added. Core team to incorporate feedback given during peer review.

  • Passes peer review x 2

    • Reviewer will be auto-added

  • Merged

  • Passes verification

  • User stories with UX/UI component: Passes validation with Loic Sans

  • Modifications to the

Team availability

S98 runs from … to …

Thursday, October 10th

Wednesday, October 23rd

Days in sprint: 9 (Monday October 11: Canadian Thanksgiving)

  • No labels