Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Start recording on Zoom!

Themes and priorities for this sprint: 

  1. Review https://github.com/LiteFarmOrg/LiteFarm/pull/2931 and (ideally) get high value e2e running when integration is rebuilt

  2. Begin work on fully interactive user interface for Livestock Dashboard (https://www.figma.com/file/eMffC0h3JPlWtzNttxJpil/Litefarm-Updated?type=design&node-id=2780%3A48212&mode=design&t=mckGufx4VmYiUCAx-1), including:

    1. Search

    2. Filters

    3. Interactive KPIs

    4. Desktop, mobile, and tablet views

    5. Mocking of interactions and links to other pages, but no actual navigation / actions

  3. Tech debt tickets

    1. SPIKE on build vs. buy for CSV upload

Pre-reading for this sprint 

Intro reads:

Livestock specific reads:

We’re still working on Detailed livestock records V1, so if you have 20-minutes or less before planning, read this. It’s the most relevant and probably the right level of detail for jumping in quickly without understanding the big picture.

Other readings haven’t been significantly updated since S78. However, they’re listed below from most high level to most detailed:

What’s the definition of done for a story? 

  • Code

  • Language tags - (run pnpm i18n script in /webapp )

    • If En copy changes on a ticket please set all the non-En tags to “MISSING”

    • Es version of the language tag as “MISSING”

    • Pt version of the language tag as “MISSING”

    • Fr version of the language tag as “MISSING”

  • Unit testing

  • Check in with Loic Sans if there’s a visual component to the story

  • Open up a PR, and leave it unassigned. Two reviewers from the core team will be automatically added. Core team to incorporate feedback given during peer review. (Check if this is working well for PRs from forks from contributors).

  • Passes peer review x 2

    • Anto will review all PRs

    • Second reviewer will be auto-added

  • Merged

  • Passes verification

  • Passes validation

    • Loïc and Anto to fill in for David/Kevin on validation

Team availability

S80 runs from … to …

Thursday, February 1st

Wednesday, February 14th

Days in sprint: 9

  • No labels