We shouldn’t have situations where the beta server doesn’t successfully deploy, but the export server does.
Area / scope to test | Front end | Back end | Model | Notes |
---|---|---|---|---|
Requirement specific constraints |
|
| N/A |
| |
Role based constraints | N/A | N/A | N/A | Does role determine what a user can see or do? Is this enforced uniformly across the front end and back end? |
Locale based constraints |
|
|
| Things like date format, and number format for phone numbers and currency inputs |
User preferences constraints |
| N/A | N/A | Is this impacted by user or farm preferences such as language, system of measure, certification status? |
Farm-level defaults / preferences | N/A | N/A | N/A |
|
Numerical input constraints | N/A | N/A | N/A | Do we |
Text input constraints
N/A
N/A
N/A
Do we appropriately handle blank, very small, and very large inputs? Is there a strict format (such as email) that must be followed?
Date based constraints
N/A
N/A
N/A
Are there logical restrictions on what dates can be input? Should a use be able to complete something in the future for example.
Date based assumptions
N/A
N/A
N/A
Are we making valid assumptions about what dates should be allowed?
Timezone driven interactions
N/A
N/A
N/A
If timezones play a role in the data, are they being displayed or converted appropriately?
Interaction / transitioning UI based constraints
N/A
N/A
N/A
Is the UI transitioning appropriately? Is the API providing da
Flow based constraints
N/A
Is state being preserved appropriately in a flow? If I go back and then forth, is it maintained? Is state invalidated when it should be?
Synchronous / asynchronous constraints
N/A
N/A
N/A
Is the interaction synchronous, asynchronous, or does it support both? Can you simulate both if so?
Time-out / low bandwidth constrains
N/A
N/A
N/A
Does the feature fail gracefully under no bandwidth / low bandwidth environments?
Data transformation correctness
N/A
Is the data persisted as expected post-transformation?
Are values appropriately updated when units change? Is it WYSIWYG?
Outcome correctness
Is it clear whether the outcome was a success of failure? Does it have the “right” visual treatment?
When inputting known inputs with expected outputs - do you get the results you expect? Have you tested several “cases” of this?
Switching farms
Does this feature respond well to switching farms (and returning)?
Notification constraints
Should a notification be marshalled based on this action?
Cascading effects
Are there logical places
Integration constrains
Do we need to ensure state is consistent between LiteFarm and the external service? What failure cases do we need to handle? How do we report back the outcome to the user or external service?
Concurrency
appro |