Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

@Link to the recording:

https://ubc.zoom.us/rec/share/j-dpOxt15_yIOzOXR733DBxspTeLjK_p27pC6IdQHJt0p64gVPmGatrYgfyh-BDS.QEJUsmjMsKrl2mtw

Passcode: rc?0V0#^

Themes and priorities for this sprint: 

  1. PREPARING FOR THIS RELEASE: https://lite-farm.atlassian.net/projects/LF/versions/10018/tab/release-report-all-issues (Soil amendment)

    1. Jira Legacy
      serverSystem Jira
      serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
      keyLF-4213

      1. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-4251

      2. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-4260

      3. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-4225

      4. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-4249

      5. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-4221

    2. Jira Legacy
      serverSystem Jira
      serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
      keyLF-4029

    3. Jira Legacy
      serverSystem Jira
      serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
      keyLF-4231

    4. Bug bash on soil amendment + product-related task flows: /wiki/spaces/LITEFARM/pages/1423081473

    5. Non-development work:

      1. Release notes for 3.6.5 Loic Sans and translations Larisse Cavalcante Divya Chayanam

      2. Translation work for 3.6.5 MISSING strings Loic Sans Larisse Cavalcante David Trapp - Martina

...

  1. Continuing with: https://lite-farm.atlassian.net/projects/LF/versions/10019/tab/release-report-all-issues (Animals)

    1. Jira Legacy
      serverSystem Jira
      serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
      keyLF-4144

      1. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-4172
        preferably, but not at the expense of 3.6.5, before Loïc goes on summer vacation

    2. Jira Legacy
      serverSystem Jira
      serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
      keyLF-4150

      1. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-

      4150Animals release scope bugs
      1. 4204

    3. Bugs Available:

      1. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-42263392

      2. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-42383416

      3. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-38843898

      4. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-3606

      Other Bugs Available:

      1. User can edit an already deleted expense or revenue.

      2. An assignee of the task is not notified that the task has been abandoned as a part of the Crop plan.

      3. Delete task clickable area is too large.

      4. Can't open the water calculator for a wild crop when the method of measurement is Depth

        4244

      5. Jira Legacy
        serverSystem Jira
        serverId815f41e5-e5fb-3402-8587-82eccc3ffab0
        keyLF-4064

Reading for this sprint

Intro reads:

...

  • Code

  • Language tags - (run pnpm i18n script in /webapp )

    • If En copy changes on a ticket please set all the non-En tags to “MISSING”

    • Es version of the language tag as “MISSING”

    • Pt version of the language tag as “MISSING”

    • Fr version of the language tag as “MISSING”

  • Unit testing

  • Check in with Loic Sans if there’s a visual component to the story

  • Open up a PR, and leave it unassigned. Two reviewers from the core team will be automatically added. Core team to incorporate feedback given during peer review.

  • Passes peer review x 1

    • Reviewer will be auto-added

  • Merged

  • Passes verification

  • User stories with UX/UI component: Passes validation with Loic Sans

Team availability

S90 S91 runs from … to …

Thursday, June 20thJuly 4th

Wednesday, July 3rd17th

Days in sprint: 9 (Monday July 1st = Canada Day)10

Person

Days in sprint

Notes

David Trapp

25?

I’ll be visiting partners in Colombia from 6/24 - 7/04, responding in the eveningsOOO Jul 4 - 9

Sayaka Ono

98

OOO Friday June 21 morning for farm visitJul 15 - 16

Joyce Sato-Reinhold

9

OOO Friday June 21 morning for farm visit

Duncan Brain9

Denis Dovganyuk9

Loic Sans

5

Out June 21st + On Holiday starting 0

OOO Jul 1 (3 - 4 weeks)26

Larisse Cavalcante

9

Lite Farm

Async

Wrapping up

Divya Chayanam

Chadd Bauman (Unlicensed)

Serhii Zahranychnyi

Async

Navdeep Dhammu

Async

Gursimran Singh

Asyncshashank hegde

Joaquín Moreno

AsyncJoaquín Moreno

Navdeep Dhammu

Async